Feature image - Bundaberg Rum Re-Development

The Challenge

Tight construction and budget timeframes met that the re-development of an iconic tourist attraction needed all of its relevant approvals as soon as possible. Insite SJC were tasked to obtain all the necessary approvals within short timeframes to ensure the project could proceed.

The Solution

Insite SJC met with all of the relevant stakeholders and developed a plan to fast-track the necessary approvals to meet the client’s tight timeframes. What was supposed to take 6 – 8 months, was now a possibility in less than 4 months.
Back to Case Studies